Link


Social

Embed


Download

Download
Download Transcript

[00:00:03]

EVERYBODY READY? >> YES.

[A. Call to Order and Announce that a Quorum is Present.]

>> IT IS NOW 6:30. I'LL CALL TO ORDER THE TUESDAY OCTOBER 6TH REGULAR SESSION MEETING OF THE CITY OF LEWISVILLE PLANNING AND ZONING COMMISSION WE DO HAVE A QUORUM

[B. Approval of Minutes]

PRESENT. NEXT ITEM ON THE AGENDA IS APPROVAL OF MINUTES TO CONSIDER THE MINUTES OF THE SEPTEMBER 22ND, 2026 SPECIAL CALLED MEETING.

COMMISSIONERS IF NOBODY HAS ANY QUESTIONS OR CHANGES I'LL TAKE A

MOTION. >> MOTION TO APPROVE.

>> SECOND. >> MOTION BY RICK.

LOOKS LIKE WE'RE A LITTLE SLOW TODAY.

>> AND SECONDED BY ME. >> DID THAT REGISTER?

>> YES, IT HAS ON MY SCREEN. YEAH, IT'S RIGHT HERE.

MOTIONED BY RICK, SECONDED BY JACK.

THERE WE GO. EVERYONE VOTE PLEASE.

AND MOTION PASSES FOUR WITH THREE ABSENT.

[C. Public Hearings]

ALL RIGHT NEXT WE HAVE A PUBLIC HEARING.

CONSIDERATION OF A A SPECIAL USE PERMIT FOR AN ACCESSORY STRUCTURE; ON AN APPROXIMATELY 0.3979-ACRE LOT, LEGALLY DESCRIBED AS HIDDEN COVE ESTATES, PHASE 1, BLOCK N, LOT 13; LOCATED AT 2812 TREASURE COVE DRIVE, ZONED SINGLE FAMILY RESIDENTIAL (R-5) DISTRICT; AS REQUESTED BY LOGAN MCALLISTER, OF DESIGN CLASSICS, ON BEHALF OF ALLEMAN, STUART & CYNTHIA REVOCABLE TRUST, THE PROPERTY OWNER. (CASE NO. 26-07-9-SUP).

CASE NUMBER 26 --26-07-9. >> GOOD EVENING, THE PROPERTY OWNERS ARE SEEKING TO ADD AN STRUCTURE TO THE BACKYARD TOTALLING TWO ON SITE FOR A HOBBY WOOD SHOP FROM 7.32 OF THE CODE AND ALLOW FOR MAXIMUM OF TWO ACCESSORY STRUCTURES WITH ACCUMULATIVE AREA NOT MORE THAN 500 SQUARE FEET WHICH EXCEEDS THE MAXIMUM THUS SPECIAL USE PERMIT IS REQUIRED.

IN TERMS OF ANALYSIS, THE RESIDENCE IS A CORNER LOT AND EXISTING PORTABLE SHED ON SIGHT 120 SQUARE FEET CURRENTLY USED FOR LAWNCARE STORAGE AND IT IS THE ORANGE BUILDING YOU'LL SEE ON THE EXHIBIT SHOWN ON SCREEN AND CURRENTLY IT'S AD VASENT TO THE LOT AND PROPERTY OWNERS PLAN TO ADJUST THE LOCATION FROM 5 FEET AWAY FROM THE SOUTHERN AND EASTERN LINES.

22 FEET FROM THE SOUTHERN PROPERTY LINE AND IT WILL HAVE A PERMANENT FOUNDATION AND WILL BE ARCHITECTURALLY CAPABLE WITH THE PRINCIPLE BUILDING. AND TO OTHER SINGLE FAMILY LOTS STAFF DOES NOT ANTICIPATE IMPACTS OF SURROUNDING USES AS A RESULT OF THE WORKSHOP AND THE VISION LAN UPDATE INCLUDING THRIVING NEIGHBORHOODS INCLUDING SUPPORTS RESIDENTS AS THEIR NEEDS CHANGE AND STAFF ALLOWING THEM TO UPGRADE THEIR STRUCTURE IS IN LINE WITH THIS GOAL AND STAFF ULTIMATELY FINDS THE REQUEST CAPITALA AABLE COMPATI AND WILL ENHANCE THE PROPERTY FOR THE OWNER'S BENEFIT AND ENJOYMENT THEREFORE CITY STAFF RECOMMEND APPROVAL OF THE SUP AS SET FORTH IN THE CAPTION ABOVE.

>> THANK YOU. DOES ANYBODY HAVE ANY QUESTIONS FOR STAFF? OKAY.

WITH NO QUESTIONS WE'LL NOW OPEN THE PUBLIC HEARING.

ANYONE WISHING TO SPEAK ON THIS ITEM CAN COME FORWARD, PLEASE STATE YOUR NAME AND CITY FOR THE RECORD WELCOME.

>> HI. MY NAME IS JEFF WARO AND I'M THE ARC CHECKETER AND DESIGNER AND BUILDER OF THIS I DON'T HAVE A STATEMENT TO MAKE JUST ONLY IF YOU HAVE A QUESTION.

>> DOES ANYBODY HAVE ANY QUESTIONS? ON THE STRUCTURE? NO, SEEMS PRETTY

STRAIGHTFORWARD. >> ALL RIGHT, THANK YOU.

>> THANK YOU. OKAY WITH THAT WE WILL GO AHEAD AND CLOSE THE PUBLIC HEARING. COMMISSIONERS, ARE WE READY TO

MAKE A MOTION? >> MOTION TO RECOMMEND APPROVAL

FOR SPECIAL USE PERMIT. >> MOTION BY AINSLEY SECONDED BY RICK. PLEASE VOTE.

AND THE MOTION PASSES WITH 4 IN FAVOR AND THREE ABSENT.

>> COMMISSIONERS, THIS ITEM WILL BE CONSIDERED BY THE CITY COUNCIL WHO WILL HOLD A SECOND PUBLIC HEARING AND MAKE A FINAL

[00:05:01]

DECISION ON MONDAY NOVEMBER 2ND, 2026 AT 7:00 P.M.

THANK YOU. >> THANK YOU.

OUR NEXT PUBLIC HEARING IS A CONSIDERATION OF A RECOMMENDATION TO ADOPT THE LEWISVILLE 2035 VISION PLAN.

>> GOOD EVENING, COMMISSIONERS. I WAS ABLE TO GIVE YOU GUYS AN UPDATE ABOUT THIS PROJECT A FEW WEEKS BACK SO WE'RE HAPPY IT BRING IT BEFORE YOU AGAIN FOR RECOMMENDATION FOR ADOPTION.

I HAVE WITH ME TO HELP PRESENT WENDY WITH FRIESEN NICHOLS WHO

IS OUR LEAD CONSULTANT. >> THANK YOU.

AND GOOD EVENING. I AM SO EXCITED TO BE HERE TONIGHT. TO PRESENT THE RECOMMENDATIONS OF A VERY LENGTHY AND ENGAGED EFFORT THAT WE'VE HAD SO THANK YOU FOR HAVING US. I'M GOING TO GIVE A QUICK PROCESS CHECK IN TALK ABOUT OUR MOST RECENT ENGAGEMENT OUTCOMES, MICHELLE IS GOING TO GO THROUGH A SUMMARY OF THE PLAN CONTENT AND THEN HOPEFULLY WE GET YOUR RECOMMENDATION TO MOVE THIS FORWARD TO COUNCIL. SO JUST AS A QUICK REMINDER THIS HAS BEEN AN 18 MONTH EFFORT THAT WE'VE BEEN GOING THROUGH WE STARTED BACK IN SPRING KICKING THIS PROJECT OFF, WE IDENTIFIED BIG ISSUES, BIG IDEAS, BIG MOVES AND BIG ACTIONS AND NOW WE ARE AT THE FINAL PHASE OF THIS PROCESS TO BRING IT FORWARD FOR ADOPTION. WHEN WE SET OUT TO DO THIS WE WANTED THIS TO BE A PLAN THAT REPRESENTED THE CITY OF LEWISVILLE AND WHEN WE DID -- WE WERE LUCKY TO BE THE CONSULTANTS THAT DID THE 2014 PLAN AND WE HAD ABOUT 1500 TOUCH POINTS, THE 2021 PLAN HAD JUST UNDER 4,000 AND SO WE SET IT AMBITIOUS GOAL THIS TIME TO DOUBLE THAT TO ABOUT 8,000 TOUCH POINTS AND AS YOU CAN SEE FROM THIS SLIDE, WE DID A REALLY GOOD JOB OF ENGAGING THE CITIZENS. WE HAD OVER 10,000 TOUCH POINTS THROUGHOUT THIS, OVER-7,000 ENGAGEMENTS ONLINE, WE HAD COMMUNITY EVENTS THAT LASTED OVER THIS LAST 18 MONTHS.

WE HAD YOUTH ENGAGEMENT WHICH WAS REALLY COOL.

CITY STAFF DID A PHENOMENAL JOB AND I WANT TO TAKE THIS MOMENT TO THANK CITY STAFF AND NOT ONLY THE PLANNING GARMENT DEPARTMENT BUT THE CITY MANAGER AND ALL THE DIFFERENT DEPARTMENTS THEY DID A VERY GOOD JOB OF ENGAGING THROUGHOUT THIS PROCESS.

THEY DID THEIR OWN OUTREACH EVENTS.

WE HAD A PHENOMENAL STEERING COMMITTEE, MANY OF YOU WERE APART OF THAT WHICH WE GREATLY APPRECIATE SO WE WERE HEAVILY INVOLVED WITH THAT COMMITTEE, WE DID A SPECIFIC OUTREACH FOR THE HISPANIC COMMUNITY. LEWISVILLE AND REO ONE OF OUR CONSULTANTS ON THE TEAM THAT HELPED WITH THAT AND AGAIN ANOTHER COMMUNITY ENGAGEMENT AND A LOT OF OUT REACHING FROM THAT AND WE ACTUALLY DID A DOOR KNOCKING CAMPAIGN.

HOPEFULFLY MANY PEOPLE WITHIN THE CITY HAVE BEEN ABLE TO HEAR ABOUT THIS PROJECT. AND JUST OVER THE PAST MONTH WHEN WE GOT THE PLAN DRAFTED WE PUT THAT ONLINE, POSTED THAT FOR ANY COMMENTS. WE DIDN'T RECEIVE A WHOLE LOT WHICH AT THIS POINT IS ACTUALLY OKAY 'CAUSE WE'VE GOTTEN SO MUCH THROUGHOUT BUT ANYWAY THE MOST OF THOSE COMMENTS WERE POSITIVE ON THE FEEDBACK THAT WE RECEIVED AND SOME OF THEM THAT WE WERE ABLE TO INCORPORATE IN THE PLAN ITSELF.

SO THE VISION PLAN ITSELF IS 37, 38 PAGES.

IT GOES THROUGH AN INTRODUCTION, A LITTLE BIT OF A SNAPSHOT OF LEWISVILLE, AGAIN WE IDENTIFIED WHAT WE CALLED BIG ISSUES, THINGS THAT WE NEEDED TO LOOK TOWARDS INVOLVED WE HAD A SECTION CALLED BIG IDEAS THAT CREATED OUR VISION STATEMENT AND PILLARS WE HAD BIG MOVES WHICH ARE WHAT ARE THOSE THINGS TO MOVE US FORWARD AND THEN BIG ACTIONS, THAT DOCUMENT IS AVAILABLE IN ENGLISH AND IN SPANISH.

AND IF YOU'RE WONDERING HOW DID YOU DO 18 MONTHS OF WORK IN 37 PAGES, THEN YOU CAN LOOK AT THE TECH TECH TECHNICAL CHAPTERS BECAUSE THERE ARE HUNDREDS AND HUNDREDS OF PAGE THAT IS ARE INCLUDED WITHIN THE APPENDIX. ALL OF THE PUBLIC INPUT THAT WE GOT, DETAILED DATA, BACKGROUND AND ASSESSMENT, ALL THE CONTENT AND THINGS THAT HELP US SUMMARIZE THOSE CHAPTERS ARE THERE SO THERE'S PLENTY OF ADDITIONAL CONTENT TO READ SHOULD YOU CHOOSE. SO WITH THAT I WANT TO TURN IT OVER TO MICHEL -- MICHELLE TO TALK ABOUT SOME OF THAT CONTENT.

>> YES AND I'M NOT GOING TO READ ALL OF THE 22 BIG ISSUES BUT JUST TO KIND OF SUMMARIZE WE DID AND I KNOW WE PRESENTED ON THESE 22 BIG ISSUES AND ORIGINALLY THERE WAS 21 IDENTIFIED AND AS WE WENT THROUGH THE PROCESS WE ALSO ADD SENIORS AND MAKING SURE THEY HAVE SUPPORT AT ALL INCOME LEVELS TO BE THE 22ND ISSUE.

THE BIG IDEAS, THE VISION STATEMENT SETTLED ON BY 2035 AND BEYOND LEWISVILLE IS WELCOMING AUTHENTIC BOLD AND CONNECTED AND

[00:10:02]

BUILT TO LAST IT'S A PLACE THAT GROWS WITH INTENTION, PROTECTS THAT MATTERS AND DELIVERS A QUALITY OF LIFE PEOPLE FEEL EVERYDAY AND THAT'S SUPPORTED BY FIVE PILLARS THAT ARE WELCOMING, KCK CONNECTIVITY, QUALITY OF LIFE AND INTENTIONAL GROWTH. AND SO THAT WAS A BIG PUSH BY THE STEERING COMMITTEE TO COME UP WITH THOSE PILLARS AND THAT VISION STATEMENT. AND THAT REALLY LED ALONG WITH ALL OF THE INPUT THAT WE RECEIVED FROM THOSE 10,000 TOUCH POINTS TO THE FRAMEWORK THAT WE CAME UP WITH FOR THIS VERSION OF THE LEWISVILLE VISION PLAN WHICH IS OUR 2035 TAPSTY.

WE USED TO HAVE 9 BIG MOVES IN 2014 AND THEN 7 BIG MOVES WITH 3 STRATEGIC MOVES AND NOW WE HAVE 5 BIG MOVES AND 5 THREADS SO I'LL TALK A LITTLE BIT MORE ABOUT EACH OF THE BIG MOVES BUT THOSE ARE THE MAPPABLE SYSTEMS THAT HAVE A BIG IMPACT ON OUR EVERYDAY LIFE SO WE GOT ECONOMIC ENGINES, WE GOT NATURAL NETWORKS, WE GOT LIFELONG LIVEABILITY AND INTEGRATED INFRASTRUCTURE AND DISTINCTIVE DESTINATIONS AND THEN WE HAVE FIVE THREADS THAT WE THROUGH ALL OF THESE BIG MOVES SO THESE WERE PRIORITIES AND VALUES THAT THE COMMUNITY KEPT SAYING OVER AND OVER AGAIN AND WE NEEDED TO FIND A WAY TO BRING THEM IN AND THAT WAS SUSTAINABILITY, FUTURE READY, SAFETY, CONNECTIONS AND COMMUNICATIONS. AND THOSE ARE THINGS THAT NEED TO WEAVE THROUGH EACH ONE OF THOSE MAPPABLE BIG MOVES AND HOW WE APPROACH ACTIONS AND ALL OF OUR ACTION ITEMS FALL AT AN INTERSECTION OF ONE OF THOSE BIG MOVES AND ONE OF THOSE THREADS THE WAY THAT WE'VE STRUCTURED THE PLAN.

SO EACH BIG MOVE HAS A GOAL WHICH DIVINES THE BROAD OBJECTIVE AND THEN IT HAS SOME ASPI ASPIRATIONAL OBJECTIVES TO HELP NARROW THAT DOWN AND GIVE IT A LITTLE BIT OF STRUCTURE. AND THEN IN THE TEXT TECHNICAL CHAPTER WE ALSO HAVE POLICY STATEMENTS AND WE DEVELOPED BECAUSE WE DON'T HAVE A TRADITIONAL FUTURE LAND USE PLAN SO WE'LL PROBABLY BE REFERRING TO THESE POLICY STATEMENTS WITH THE PLANNING AND ZONING COMMISSION WHEN WE BRING FORWARD LAND USE QUESTIONS, ZONING CHANGES IN FUTURE AND THESE POLICY STATEMENTS WILL HELP US FIGURE OUT WHAT OUR PRIORITIES ARE AND WHAT THAT APPROPRIATE ZONING AND LAND USE MIGHT BE AS WELL AS MAKE OTHER LARGER DECISIONS MOVING FORWARD OVER THE NEXT 10 YEARS. SO THAT'S ECONOMIC ENGINES WHICH IS THE GOAL THAT LEWISVILLE WILL BE AN ECONOMIC OPPORTUNITY MAGNET WHERE BUSINESSES SCALES CAREERS TAKE OFF AND LASTING WEALTH AND BUILT BY AND FOR THE COMMUNITY AND THIS REFLECTS INCORPORATES SMALL BUSINESS ALONG WITH OUR EMPLOYMENT CENTERS PREVIOUSLY WE HAD EMPLOYMENT CENTERS BUT WE HEARD A LOT FROM THE COMMUNITY SMALL BUSINESS WAS IMPORTANT TOO SO WE ROLLED THOSE TOGETHER IN OUR ECONOMIC ENGINES.

NATURAL NETWORKS WAS OUR NEXT BIG MOVE THIS WAS THAT NATURE WILL BE LEWISVILLE'S SIGNIFICANT FUTURE THAT DEFINES DAILY LIFE AND THIS TIES INTO THE GREEN CENTER PIECE AND EXTENDING THE GREEN THAT WE HAD BEFORE BUT IT EXPANDS UPON THAT ALSO BECAUSE IT'S REALLY LOOKING AS A NETWORK AND SYSTEM AND THINKING ABOUT HOW THE WATER SYSTEM IS PART OF THAT AS WELL AS PARKS AND TRAILS AND THAT SORT OF THING. LIFELONG LIVEABILITY KIND OF BUILDS WHERE WE HAD OUR THRIVING NEIGHBORHOODS WE WANT TO BE A THRIVING CITY FOR EVERYONE AT ALL STAGES IN THEIR LIFE CYCLE AND SO LIFELONG LIVEABILITY REALLY DOES MAKE SURE THAT WE'RE PROVIDING THE SERVICES THAT OUR RESIDENTS NEED AND WE'RE PROVIDING HEALTHY COMMUNITIES AND THAT'S WHAT THAT REALLY FOCUSSING ON. AND INTEGRATED INFRASTRUCTURE THIS ONE I REALLY APPRECIATED BEING IN THE PLAN BECAUSE OFTEN TIMES YOU DON'T HEAR A LOT ABOUT INFRASTRUCTURE FROM THE PUBLIC IT'S KIND OF UNSEEN BUT THIS DID COME UP A LOT AND BASED ON THE DATA AND WHERE WE ARE IN OUR LIFE CYCLE THIS IS VERY IMPORTANT WE'RE PRETTY MUCH BUILT OUT A LOT OF OUR GROWTH WAS IN THE 80S 90S SO THAT INFRASTRUCTURE IS AGING THIS IS MAKES SURE WE'RE LOOKINGT MAINTENANCE AND PRIORITIZING THE MAINTENANCE SO WE CAN LONG TERM BE SET UP FOR GROWTH AND SUCCESS AND THEN DISTINCTIVE DESTINATIONS.

THIS IS BUILD OFF OLD TOWN WITH THIS PLAN WE RECOGNIZE A LOT HAS HAPPENED IN OLD TOWN AND IT'S TIME TO LOOK AT SOME OTHER AREAS THAT NEED SOME OF THAT INTENTIONAL INVESTMENT LIKE THE MALL, LIKE THE LAKE FRONT, BUT ALSO WANTING TO MAKE SURE THAT WITHIN NEIGHBORHOODS THERE'S DESTINATIONS WHERE PEOPLE CAN GO TO ON A DAILY BASIS TO HAVE SERVICES, TO HAVE THOSE THIRD PLACES WHERE SPACES WHERE PEOPLE CAN JUST GATHER AND RUN INTO FRIENDS AND NEIGHBORS. THAT CAME UP A LOT DURING THE PLAN INPUT PROCESS WAS THIRD PLACES LIKE A LIBRARY OR COFFEE SHOP OR A PARK THOSE TYPES OF THINGS.

SO THEN THE BIG ACTIONS, CHAPTER DOES HAVE OUR POLICY STATEMENTS FOR EACH ONE OF THESE AND THOSE ARE TO GUIDE OUR LAND USE AND INFRASTRUCTURE PLANNING DECISIONS AND THOSE ARE IN THE BIG ACTIONS CHAPTER YOU'RE NOT GOING TO FIND THOSE IN THE SHORT VERSION OF THE PLAN BUT THEY ARE IN THE TECHNICAL CHAPTER.

THE TECHNICAL CHAPTER ALSO HAS OUR IMPLEMENTATION MATRIX.

THE IMPLEMENTATION MATRIX HAS 139 TOTAL ACTION ITEMS, THEY CALL WHAT THE ACTION ITEM IS, WHAT THE LEAD DEPARTMENT IS WHAT

[00:15:02]

SUPPORTS PARTNERS MIGHT BE IN OR OUT OF THE CITY AND THE TIME FRAME WHETHER IT'S SHORT TERM, MIDTERM, LONG TERM OR ONGOING AND SOME OF THEM WE WANT TO ENGLISH A NEW PROGRAM IN THE MIDTERM AND THEN WE WANT THAT TO BE ONGOING YOU'LL SEE ONGOING SOMETIMES DOUBLED UP WITH OTHER TIME FRAMES IN THERE AND THEN THAT LAST COLUMN IS FOR PERFORMANCE MEASURES SO THOSE ARE POSSIBLE PERFORMANCE MEASURES AND INDICATORS THAT THE DEPARTMENTS CAN USE TO TRACK PROGRESS ON THAT AND THOSE WILL KIND OF BE WORKED INTO EACH DEPARTMENT'S WORK PLAN MOVING FORWARD SO THAT WE KNOW THAT WE'RE WORKING TOWARDS ACHIEVING THIS PLAN. SO THAT'S THE QUICK SUMMARY OF THE PLAN. I AM ABSOLUTE HERE FOR ANY QUESTIONS THAT Y'ALL HAVE. I KNOW MOST OF YOU WERE ON THAT STEERING COMMITTEE SO WE'VE HEARD QUITE A LOT ABOUT THIS.

>> I THINK WE'RE GOOD. ALL RIGHT.

I GUESS WE'LL OPEN THE PUBLIC HEARING IF ANYBODY WOULD LIKE TO COME FORWARD WE'D LOVE TO HEAR FROM YOU, STATE YOUR NAME AND CITY FOR THE RECORD. ALL RIGHT.

WITH THAT WE WILL CLOSE THE PUBLIC HEARING.

COMMISSIONERS? WE WERE ALL ON THE STEERING COMMITTEE UP HERE SO I THINK I DON'T THINK YOU'RE GOING TO GET

ANY -- >> MOTION TO RECOMMEND ADOPT OF

THE 2035. >> THERE WE GO.

MOTIONED BY AINSLEY, SECONDED BY JACK.

PLEASE VOTE. AND MOTION PASSES WITH FOUR YESES AND THREE ABSENT. Y YAY.

>> VERY GOOD. >> COMMISSIONERS, THIS ITEM WILL BE CONSIDERED BY THE CITY COUNCIL WHO WILL HOLD A SECOND PUBLIC HEARING AND TAKE FINAL ACTION ON THE FINAL ADOPTION.

>> YAY. >> ON MONDAY, NOVEMBER 2ND, 2026 AT 7:00 P.M. AMAZING.

[D. Announcements]

>> THANK YOU, RICHARD. DO WE HAVE ANY ANNOUNCEMENTS?

>> YES. LAST NIGHT AT THE CITY COUNCIL MEETING MAYOR GILMORE HAD A PROCLAMATION PRO CLAIMING THE MONTH OF OCTOBER 2026 AS NATIONAL COMMUNITY PLANNING MONTH. SO I WANTED TO SHARE THAT WITH THE COMMISSIONERS. I WANT TO SHARE PART OF THE PROCLAMATION WHICH STATES WHEREAS LEWISVILLE CONTINUES TO GROW AND COMMUNITY PLANNING AND PLANS CAN HELP MANAGE THIS CHANGE IN A WAY THAT PROVIDES BETTER CHOICES FOR HOW PEOPLE WORK, LIVE, AND RE-CREATE WHEREAS COMMUNITY PLANNING PROVIDES AN OPPORTUNITY FOR ALL RESIDENT TO SEE BE MEANINGFULLY INVOLVED IN MAKING CHOICES THAT DETERMINE THE BEST FUTURE OF THEIR COMMUNITY AND WHEREAS THE FULL BENEFITS OF PLANNING REQUIRE PUBLIC OFFICIALS AND RESIDENTS WHO UNDERSTAND, SUPPORT AND DEMAND EXCELLENCE IN THE PLANNING PROCESS AND PLANNED IMPLEMENTATION AND WHEREAS NATIONAL COMMUNITY PLANNING MONTH RECOGNIZING THE DEDICATION OF BOARD AND COMMISSION MEMBERS LIKE THE PNZ, RES DEBT PLANNERS AND STAFF WHO HELP BUILD A GREAT COMMUNITY IN LEWISVILLE. SO WITH THAT I JUST I WANTED TO SHARE THAT WITH YOU. YOU HAVE ALL BEEN AN IMPORTANT PART OF OUR PLANNING PROCESS AND STAFF WANTS TO THANK EACH AND EVERY ONE OF YOU FOR YOUR SUPPORT ON ALL OF OUR PLANNING EFFORTS. I THINK YOU ALL WOULD AGREE LEWISVILLE'S PLANNING EFFORTS OVER THE LAST 20 YEARS HAS TRULY

TRANSFORMED OUR COMMUNITY. >> ABSOLUTELY.

>> AND THE 2035 IS JUST GOING TO REINFORCE THAT AND CARRY THAT MOMENTUM FORWARD. SO AGAIN WE TRULY THANK YOU FOR EVERYTHING THAT Y'ALL DO. WE COULDN'T DO IT WITHOUT YOU.

THANKS AGAIN. >> THANK YOU.

>> HERE, HERE.

>> ALL RIGHT. WITH THAT THEN I WILL TAKE A

MOTION TO ADJOURN. >> MOTION TO -- ADJOURN.

>> SECOND. >> MOTIONED BY RICK, SECONDED BY AINSLEY. YAY.

WE ARE ADJOURNED. THANK YOU,

* This transcript was compiled from uncorrected Closed Captioning.